During the 3D model registration stage, it is crucial to correctly specify the position of the glue line. There are two main scenarios:
The Stone is Glued as Originally Planned in the HPC Project
In this case, the glue line should be set exactly as shown in the HPC plan.
The current slide demonstrates how the glue line should be aligned in such a scenario.

2. The Gluing Point Differs from the HPC Project
If the actual glueing point does not match the initial HPC plan, follow this recommendation: